Answer question 11 only

Question 11You are the project manager of an environmental company that was hired to cleanup a historical arsenic contamination site. Soil sampling results indicated the area impacted with arsenic above action levels is 30 feet by 55 feet. The depth of the arsenic plume is three feet below ground surface. The land owner wanted to clean this site for future development. Using your textbook, answer the questions below to help you prepare a cost estimate for this portion of the project. Your solutions and any assumptions to justify your estimate must be shown.1.What is the chemical symbol of arsenic, and what group/family does it belong to?.2.Solve for the minimum volume of soil that will be excavated in cubic yards?.3.If each dump truck can transport 18 cubic yards, determine how many dump trucks loads will be transported? For calculation purposes, add a 15% \”fluff factor\” (add to the volume that will be transported)..4.If the bulk density of soil is 1350 kg/m3 (84.3 lb/ft3), solve for the weight of the soil that will be transported to a disposal site in kilograms?.  Your total response to parts a-d must be at least 200 words in length. You are required to use at least your textbook as source material for your response. All sources used, including the textbook, must be referenced. Paraphrased and/or quoted material must have accompanying citations in APA format.

Are you looking for a similar paper or any other quality academic essay? Then look no further. Our research paper writing service is what you require. Our team of experienced writers is on standby to deliver to you an original paper as per your specified instructions with zero plagiarism guaranteed. This is the perfect way you can prepare your own unique academic paper and score the grades you deserve.

Use the order calculator below and get started! Contact our live support team for any assistance or inquiry.

[order_calculator]